An annualisation scheme says how working time is counted: its type, reference period, target, thresholds, premiums and closing rules. This article is for the administrator who creates schemes, updates them through dated versions and tests new rules before publishing them.
Before you start #
- Annualisation schemes (settings) permission: Access level to read schemes, Execute level to create, version, duplicate and archive them and to simulate drafts. By default, only the Administrator holds it.
- The Annualised working time module must be installed (see Understanding annualised working time).
Opening the schemes #
Go to Settings › Annualised working time › Annualisation schemes, or Annualised working time › Settings. The list shows each scheme’s name, code, type, sub-company (or All sub-companies) and the version in force, for example “Version 2 since 01.01.2027”, or Not yet in force. Tick Show archived schemes to see those too.

Creating a scheme #
- Click New scheme.
- Enter the Code (letters, digits, hyphen and underscore, 40 characters at most, unique to this scheme) and the Name.
- Choose the Type: Modulated annualisation, Seasonal (period = contract), Modulated part-time or Annual day rate. Changing the type clears the rules already entered.
- Choose the Sub-company: All, or a specific sub-company. A scheme specific to a sub-company can only be assigned to that sub-company’s contracts.
- Enter the Effective from date of the first version. It may be in the past.
- Set the rules (see below), then click Create the scheme.
A new scheme contains no business values: you enter your own, or have an installed pack propose them.

A scheme’s rules #
Reference period #
- Period start: Fixed date (with Day and Month), Employee’s own date, First week of a month (with Month and Week used) or, for seasonal schemes only, Contract duration.
- Length (weeks): 52 by default, from 1 to 104.
- Seasonal: Successive contracts, either One period per contract or One period across chained contracts with the Maximum gap between contracts (days).
Target #
- Hours of actual work over the period (required); for a seasonal scheme, the Reference weekly hours; for an annual day rate, the Days worked over the period.
- Solidarity day included. If it is not (annual day rate excluded), the Worked solidarity day list says what happens to it: “Information only: the target does not change” or “Its hours are added to the period target”.
- Prorated for part-time, ticked by default: the target follows the employee’s activity rate.
Range and overtime #
For modulated annualisation and seasonal schemes: Weekly minimum (h), Weekly maximum (h), Maximum average (h) over N weeks, High week from (h), At most N high weeks in a row, Annual quota (h), then the thresholds, premiums and rest, described in Overtime, exceptional hours and quota. These bounds feed the controls (see Annualisation controls and alerts). Modulated part-time and the annual day rate have their own sections (see Annual day rate and modulated part-time).
Absences and excluded hours #
- Absence valuation: From the schedule (the hours planned for the day) or Daily basis, with Paid absence (h/day) and Unpaid absence (h/day).
- Exceptional hours excluded from the end of period (counted as actual work): the categories managers and HR will be able to declare.
- Drift alert beyond (h), in days for an annual day rate: the projected variance beyond which an alert is raised.
End-of-period closing #
The surplus handling allowed in the review, the one used for bulk closing, carrying the shortfall over and the payroll month of a week spanning two months. See End-of-period reviews and closing.
Pre-filling from an installed pack #
- In the rules editor, click Pre-fill from an installed pack.
- If packs from several countries are installed, choose the scheme’s country: their rules are not mixed.
- The Pre-fill from installed packs window lists each proposed field, its value and its source (pack, version, article). Fields still empty are ticked; a field already filled in shows “replaces the entered value”.
- Tick or untick the fields, then click Fill the ticked fields.
- Review the rules, then save with Create the scheme, Save the version or Save the draft: nothing is saved before that.
When several packs propose the same field, the value most favourable to the employee wins; otherwise the agreement, being more specific, wins over the law. If no installed pack carries an annualisation rule for this type of scheme, the window says so: enter the rules by hand, as for a company agreement.
Updating a scheme through versions #
Click a scheme to open its sheet. Each version shows its dates and status: Past, Current or Upcoming. Click a version to read its rules.
- Click New version: the rules of the latest version are copied.
- Enter the Effective from (today at the earliest) date. It must come after the latest version’s date.
- Change the rules, then click Save the version.
- A past or current version is frozen. A new version never touches an earlier period.
- An Upcoming version can be changed with the Edit the version pencil; its date must stay between the previous and the next version. The Delete the version bin deletes it straight away, without confirmation.
- A scheme keeps at least one version: to stop using it, archive it.

Duplicating, archiving #
- Duplicate: enter a Code and a Name, then click Create the copy. The copy is an independent scheme, of the same type and sub-company, taking the rules of the version in force; its first version takes effect the same day.
- Archive works in one click, without confirmation: the scheme is no longer offered for new assignments and leaves the list unless you tick Show archived schemes. Unarchive restores it.
Drafts and simulation #
The Drafts and simulation section of the sheet prepares new rules without changing anything, for example during a negotiation: a draft is never read when counters are calculated.
- Click New draft, enter the Draft name, then click Create the draft: it starts from the version in force.
- Rules: change the rules, then click Save the draft.
- Simulate: choose the Period containing date (today: the current period and its projected counter; a past date: a finished period, whose review is redone), then the Employees: Everyone assigned to the scheme, A population (sub-companies, departments, positions, contract types) or Choose the employees. Click Launch the simulation.
- The simulation runs in the background; a notification tells you when it is ready. Click the draft’s Simulation badge to open the comparison.
- Publish: enter the Effective from (today at the earliest) date, then click Publish the version. The draft becomes a new dated version of the scheme.
The comparison shows, before (rules in force) and after (draft rules), the totals then each employee: period target, projection, projected variance, overtime by rate, rest, quota used, control anomalies and, for a finished period, the review’s excess and shortfall. Export (.xlsx) turns it into an Excel file.

Good to know #
- A simulation writes nothing: each employee is recalculated with the rules in force then with the draft’s rules, and everything is undone. It covers 2,000 employees at most.
- Period bounds stay as they are today: a change of period start or length cannot be simulated.
- If you change the rules after a simulation, its badge shows “rules changed since”. Publishing does not require a simulation, but a reminder appears if no finished simulation covered the current rules.
- A published draft can no longer be changed: create a new one. The Delete the draft bin deletes an unpublished draft straight away, without confirmation.
- Every action on a scheme is recorded in the module’s log, with the old and the new value.
