Annualisation controls watch the limits set in the schemes: weekly range, multi-week average, high weeks, counter drift, the bounds of modulated part-time, and the rest and interview of employees on an annual day rate. This article explains where thresholds are set, how to choose for each control between alert, blocking and disabled, and how managers and HR read and receive alerts.
Before you start #
- Setting the controls: Annualisation schemes (settings) permission, Access level to read the rules, Execute level to write them (Administrator by default).
- Reading and receiving alerts: Team annualisation counters permission at Access level, for employees within your scope (Administrator, HR Manager, Manager and Auditor by default).
- Blocking at planning time requires the Scheduling module (see Creating and publishing a schedule).
Thresholds and levels: two separate settings #
- Thresholds are set in the scheme: Weekly minimum (h), Weekly maximum (h), Maximum average (h) over N weeks, High week from (h) and At most N high weeks in a row, Drift alert beyond (h), plus the bounds of modulated part-time and of the annual day rate (see Creating and updating an annualisation scheme). A threshold left empty is not checked.
- The level of each control is set in Settings › Annualised working time › Controls: Alert, Blocking or Disabled.
The controls #
| Control | Schemes concerned | Checked on the schedule |
|---|---|---|
| Weekly maximum exceeded | All except annual day rate | Yes |
| Below the weekly minimum | All except annual day rate | No |
| Multi-week average exceeded | All except annual day rate | Yes |
| Too many consecutive high weeks | All except annual day rate | Yes |
| Counter drift | All | No |
| Above the variation | Modulated part-time | Yes |
| Legal duration reached | Modulated part-time | Yes |
| Below the variation | Modulated part-time | No |
| Below the floor, not agreed | Modulated part-time | No |
| Day too short | Modulated part-time | Yes |
| Working span exceeded | Annual day rate | Yes |
| Insufficient daily rest | Annual day rate | No |
| Insufficient weekly rest | Annual day rate | No |
| Carried-over days not taken | Annual day rate | No |
| Workload interview due soon | Annual day rate | No |
| No workload interview recorded | Annual day rate | No |
| Workload interview overdue | Annual day rate | No |
In the screen’s list of controls, those not checked on the schedule show “worked time only”.
Setting a control’s level #
- Open Settings › Annualised working time › Controls (Annualisation controls page).
- Click New rule.
- Choose the Control, then the Level: the form proposes Blocking by default, change it if needed.
- Define the scope: a Sub-company (or All sub-companies) and, if needed, a population: Departments, Positions, Contract types, Categories, Seasonal workers only, Minors only.
- Click Save: “Rule saved.” appears.
The list shows each rule, its level and its scope. Change the level directly in its drop-down list; the Delete the rule bin deletes it straight away, without confirmation, and the control falls back on the less specific rule, or on alerting. Only one rule is allowed per control and scope: a second one is refused (“A rule already exists for this control and this scope.”).

Which rule applies? #
For a contract, the most specific rule wins: sub-company and population, then population alone, then sub-company alone, then the rule for everyone. Without a rule, a control alerts: the empty list says so (“No rule: every control alerts.”).
What each level does #
| Level | On the schedule, before publishing | On hours already worked |
|---|---|---|
| Alert | A conflict flagged, which can be ignored. | An alert to the manager and HR. |
| Blocking | A conflict that cannot be ignored; the shift is excluded from claims and automatic assignment, and publishing the batch containing it is refused. | An alert, as at Alert level: an hour already worked cannot be prevented. |
| Disabled | Nothing. | Nothing. |
Reading the alerts #
Open Annualised working time › Home, Alerts view. The Control alerts table lists the open alerts within your scope: the employee, the control, the measurement and its bound (for example “47 h / 45 h”), the day, week or due date concerned, and the level. An alert closes by itself when the anomaly disappears, for example after a time entry is corrected; when empty, the view shows “No open alert.”.

Anomalies can also be read in the employee’s counter, under “N issue(s) to review”, week by week or day by day; those coming from the upcoming schedule show “planned” and raise no alert. In My team and the Dashboard, columns count the open alerts and the employees drifting.
Being notified #
Every morning, a summary of new alerts goes to the bell and by email to the people holding the Team annualisation counters permission whose scope covers the employee: their manager, HR. An anomaly only gives rise to one notification. Each person sets this notification in their preferences: Annualised working time: control alerts (daily summary) (see Choosing your notifications).
Good to know #
- Alerts arise from the counter calculation, in the background: an anomaly appears after the week concerned has been recalculated.
- Drift compares the projected variance at the end of the period with the scheme’s threshold, in either direction (ahead or behind).
- A part-time or annual day rate control only applies to schemes of that type.
- For an annual day rate, an exceptional reduction of daily rest recorded by HR marks the anomaly as justified, without removing it. For modulated part-time, the employee’s agreement lifts the Below the floor, not agreed anomaly for the weeks starting on its date (see Annual day rate and modulated part-time).
- Thresholds are never imposed by the module: a scheme without a threshold does not trigger the corresponding control.
