---
title: "Damage, re-billing and deduction from pay"
description: "How a damage report opens, how the equipment manager decides on a repair or a loss, and how a re-billing to the employee is proposed, accepted or contested, approved by HR and then settled."
url: "https://illizeo.com/en/centre-aide/equipment-damage-and-re-billing/"
updated: "2026-11-27"
category: Equipment rental
---

# Damage, re-billing and deduction from pay

An item comes back damaged, an accessory is missing, a borrower reports a breakage or a loss: a damage report opens. The equipment manager decides what happens next (repair, loss or no further action) and can, if needed, re-bill the damage to the employee. The employee accepts or contests, HR approves, then the amount is deducted from pay or paid directly. This article is for equipment managers and for the people who handle re-billing.

## Before you start

Permissions in the matrix, **Equipment** module, held from the Access level:

| Permission | What it allows | Default |
| --- | --- | --- |
| **Damage — View** | See the Damage screen and the reports on items in your scope. | Administrator, Equipment manager |
| **Damage — Create** | Report damage on a loan in progress. | Administrator, Equipment manager |
| **Damage — Edit** | Decide, change the decision, close a report. | Administrator, Equipment manager |
| **Rebilling — View** | Read amounts and re-billing. | Administrator |
| **Rebilling — Create** | Propose a re-billing. | Administrator |
| **Rebilling — Edit** | Approve (HR circuit) and settle a re-billing. | Administrator |
| **Rebilling — Delete** | Cancel a re-billing proposed by someone else. | Administrator |

The “Approval of an equipment re-billing to an employee” process must be active in Workflows: without it, no re-billing can be proposed. The employee’s answer period is set in **Equipment › Settings** (10 days by default).

## Where damage reports come from

- **Found on return**: at the counter, a Damaged or Out of service condition, or a missing accessory, opens the report when the return is confirmed.
- **Reported by the borrower** or **Reported by a manager**: during a loan in progress, **Report a breakage or a loss** (booking or movement record) or **Report damage** (Damage screen, with the item code). Reason, description, up to 5 photos, then **Send the report**.

Only one report stays open per loan: a second report leads to the one already open. The people who follow damage for the item are notified.

## The Damage screen

Open **Equipment › Damage**. You can search the list by item or person and filter it by status (**Awaiting decision**, **Decided**, **Closed**), decision, origin and re-billing. Click a line to open the report: reason, description, condition on return, missing accessories, photos, borrower and links to the loan and the return.

## Deciding what happens next

1. In the report, click **Decide**.
2. Choose the decision:
   - **Repair**: the item goes to repair if it is not there already; it must be back (record its return first). Enter the **Repair cost** and its currency if you know it.
   - **Loss**: the item becomes “Lost”; if it is out, the loan closes and its upcoming bookings are cancelled. A loss is final: an item that is found again is entered in the inventory again.
   - **No further action**: the item this damage had put in repair becomes available again, and the report is closed.
3. Add a comment if needed and, for a repair, tick **Cancel the upcoming bookings of this item** if they cannot be kept (their borrowers are told).
4. Click **Save the decision**.

As long as no re-billing is in progress or settled, **Change the decision** remains possible. **Close without re-billing** closes a decided report. Nobody decides on damage that concerns them. For a batch, the status does not change: adjust its quantity in the inventory if units are lost.

## Proposing a re-billing

Damage decided as a repair or a loss can be re-billed to the borrower.

1. In the report, click **Propose a re-billing**.
2. Enter the **Amount** (greater than zero), the **Currency** (empty: that of the item’s purchase value) and **What the amount covers**.
3. Confirm: “Re-billing proposed to the employee.”

The module calculates no amount and knows no cap: a deduction from pay must respect the applicable law and the employee’s consent. Only one re-billing is in progress at a time per damage report, and nobody proposes a re-billing to themselves.

## The employee’s answer and HR approval

- The employee is notified by email. In the report, they see “Answer expected until” and choose **Accept** or **Contest**; contesting requires a reason.
- On their answer, or at the end of the period without an answer (“No answer within the period”), the re-billing moves to **Awaiting HR approval**.
- The approvers are the holders of **Rebilling — Edit** whose scope reaches the employee; failing that, the payroll manager of their scope. They decide in Workflows; once approved, it becomes **Approved — to settle**, once declined, **Declined**.

The **Re-billing progress** timeline shows the steps: Proposal, Employee’s answer, HR approval, Settlement, Closure.

## Settling: deduction from pay or direct payment

1. On an approved re-billing, click **Settle**.
2. Choose **Deduction from pay** and the **Month of the deduction**, or **Direct payment** with the **Payment date** and its **Reference**.
3. Click **Save**.

The deduction adds a one-off deduction line to the contract’s pay items, on the 1st of the chosen month. It is refused if that month’s payroll is already approved, if the employee has no active contract that month, or if the re-billing is not in the contract’s currency: choose direct payment instead. A recorded deduction cannot be undone. The status becomes **Deducted from pay** or **Paid**.

**Cancel the re-billing** remains possible as long as it is neither settled nor declined: by the person who proposed it, or by whoever holds **Rebilling — Delete**.

## Who sees what

| Information | Who reads it |
| --- | --- |
| The report (item, reason, description, photos, decision) | The equipment managers whose scope reaches the item, the borrower, re-billing holders, the current approver |
| The repair cost | The readers of the re-billing (next row) and the equipment managers whose scope reaches the item |
| The re-billing (amount, answer, HR decision, settlement) | The borrower, holders of Rebilling whose scope reaches them, the current approver; never the line manager, never the equipment manager alone |

The line manager may know that damage exists, never its amount. What cannot be read is not shown.

## Good to know

- A loan with damage awaiting a decision, or with re-billing in progress, is not anonymised by retention before it is settled.
- The “Equipment damage and losses” system report and the “Damage and costs” card of the analysis show the damage of the period (see [Equipment dashboard, analysis and reports](https://illizeo.com/en/centre-aide/equipment-dashboard-and-analysis/)).
- Damage on a customer rental line has no employee borrower: it is not re-billed through this circuit.

### *Similaire*
