---
title: Assigning contracts and managing periods
description: Assign a contract to a scheme one by one or in bulk, end or remove an assignment, change scheme and follow the reference periods, seasonal contracts included.
url: "https://illizeo.com/en/centre-aide/annualisation-assignments-periods/"
updated: "2026-11-26"
category: Annualised working time
---

# Assigning contracts and managing periods

An employee only enters annualisation once their contract is assigned to a scheme. The assignment creates their reference periods and their target. This article explains to HR how to assign a contract, assign a scheme in bulk, change scheme and follow the periods, seasonal contracts included.

## Before you start

- **Assignment of contracts to a scheme** permission: Access level to read assignments, Execute level to assign, end and remove them. By default: **Administrator** and **HR Manager**. You only act on employees within your scope (see [Defining a role’s target population](https://illizeo.com/en/centre-aide/roles-target-population/)).
- At least one scheme that is not archived must exist (see [Creating and updating an annualisation scheme](https://illizeo.com/en/centre-aide/annualisation-schemes/)).
- The employee must have a contract running on the assignment date.

## Opening the assignments

Go to **Settings › Annualised working time › Assignments and periods**. The **Annualised working time › Settings** menu entry leads to the schemes and is only shown to those who can read them (the administrator, by default): an HR Manager goes through Settings.

The table lists the assigned contracts: **Employee**, **Scheme**, **From**, **To**, **Current period**, **Target** and **Variance to date**. The **Filter by scheme** list narrows the view to one scheme.

![Assignments table with an expanded row showing the employee’s counter and reference periods](https://i0.wp.com/illizeo.com/wp-content/uploads/2026/11/annualisation-rattachements-periodes-01.en_.png?resize=800%2C461&quality=80&ssl=1)
Assigned contracts and their reference periods

## Assigning a contract

1. Click **Assign a contract**.
2. In **Employee**, type at least two characters of the name or employee ID, then choose the contract offered (with its dates). **Change** lets you pick another one.
3. Choose the **Scheme**.
4. Enter the **Assigned from** date. It must fall within the contract.
5. For a scheme whose period starts on the employee’s own date, fill in the **Own date (optional)** if needed; left empty, the contract start date is used.
6. Click **Assign**: “Contract assigned, periods computed.” appears.

The periods are created straight away; their counter is calculated in the background and shows “The counter has not been computed yet.” until it is. Each contract is assigned separately: an employee with several jobs has one counter per assigned contract.

The server refuses an archived scheme (“This scheme is archived.”), a scheme specific to another sub-company, a date outside the contract (“The attachment starts within the contract.”) and overlapping dates (see “Changing scheme”).

![Assign a contract form with the employee search, the scheme, the assignment date and the own date](https://i0.wp.com/illizeo.com/wp-content/uploads/2026/11/annualisation-rattachements-periodes-02.en_.png?resize=800%2C357&quality=80&ssl=1)
Assigning a contract to a scheme

## Assigning in bulk

1. Click **Bulk assign**.
2. Choose the **Scheme** and the **Assigned from** date.
3. Define the population: **Sub-companies**, **Departments**, **Positions**, **Contract types**, **Categories** (if your workspace has them), **Seasonal workers only**, **Minors only**. A filter left on **All** does not narrow anything.
4. Click **Preview**: the number of contracts that will be assigned appears with their list, then those left out because they are already assigned on that date, outside the scheme’s sub-company or outside your scope.
5. Click **Confirm the assignment**. Only the contracts kept are assigned.

The population is made of the contracts running on the chosen date. Changing a criterion, the scheme or the date clears the preview: request it again before confirming.

![Bulk assignment with the population filters and the preview of contracts kept and left out](https://i0.wp.com/illizeo.com/wp-content/uploads/2026/11/annualisation-rattachements-periodes-03.en_.png?resize=800%2C494&quality=80&ssl=1)
The preview before assigning a scheme in bulk

## Ending or removing an assignment

- **End**: in the **To** column, choose the end date in the **End of assignment** picker. “End of assignment saved. The counters are updating in the background.” appears; the current period stops on that date. An end before the start is refused.
- **Remove**: an assignment that has not started yet shows a bin, **Remove the assignment**. The “Remove this assignment?” window warns: “Its periods are deleted; the assignment it had closed is reopened.”. Confirm with **Remove**. An assignment that has started cannot be removed: set its end date.

## Changing scheme

To move an employee to another scheme, assign their contract to the new scheme on the date of the change. The current assignment is closed the day before: its period ends that day, with the **Scheme change** mention, and a new period opens under the new scheme. Each gets a target in proportion to its length. Any other overlap of dates is refused: “This contract is already attached to an annualisation scheme on these dates.”.

## Reference periods

Click a row’s arrow to expand, as the case may be, the period’s review, its counter, the annual day rate actions, then the list of periods. For each one:

- its dates: those of the scheme (for example 1 January to 31 December), shortened by **Joined mid-period**, **Left mid-period**, **Scheme change** or **End of assignment**, mentions shown on the period;
- its target, in hours (h) or days, in proportion to the weeks of presence and, if the scheme says so, the activity rate, shown when it is not 100%;
- the **Closed** mention once its review is closed.

Periods are opened up to the one containing today; the next one opens by itself at its start, during the overnight run. A closed period is never rewritten.

## Successive seasonal contracts

- A seasonal worker’s period is their contract, up to its planned end; an early departure shortens it.
- With **One period per contract**, each season has its own period and review.
- With **One period across chained contracts**, a season that follows the previous one under the same scheme, within the maximum gap set, is chained to it: **Chained to the previous season** appears and a single review covers the whole chain.
- Renewal: when an employee assigned to a seasonal scheme gets a new seasonal contract, that contract is automatically assigned to the same scheme from its start, with no action on your part. You can end that assignment, or remove it as long as it has not started. Nothing happens if the scheme is archived or specific to another sub-company.

## Good to know

- The **Time account** mention next to an employee means their attendance profile also keeps a time account: both counters coexist, and payroll receives the hours only once.
- For modulated part-time (agreement below the floor) or an annual day rate (interview, buy-backs, rest reductions), other actions are on the row and in its expanded area: see [Annual day rate and modulated part-time](https://illizeo.com/en/centre-aide/annualisation-day-rate-part-time/).
- To carry over what another tool had already counted, assign the contracts first, then import the balances (see [Carrying over balances from another tool](https://illizeo.com/en/centre-aide/annualisation-carry-over/)).
- Assignments can also be read and written through the public API, with the same permissions (see [Administering the annualised working time module](https://illizeo.com/en/centre-aide/annualisation-administer/)). Every assignment, end or removal is recorded in the module’s log.

## FAQ

### The assignment is refused because the contract is already assigned on these dates: what should I do?

The contract already has an assignment covering these dates that is not the previous open one. First set that assignment’s end date, or remove it if it has not started.

### An employee joins during the year: is their target reduced?

Yes. Their first period starts on their joining date, shows Joined mid-period, and their target is calculated in proportion to their weeks of presence.

### *Similaire*
